During the last century a number of reports were produced with a view to improving Auckland’s transport systems including:
In the 1920’s the Merc & McLelland Report (mentioned in BABJ A680/75)
The 1949 Halcrow & Thomas Report (BBAD 1054/991a)
The 1965 De Leuw Cather Report (summary report in BAEI 10003/356c)
Detailed planning and investigation work was undertaken in response to each of these reports.

In 1928-1929 detailed plans were drawn up for a rail link between the main trunk line station on Beach Road, underneath the central business district, to Morningside on the North-Western route to Kumeu - known as the Auckland Morningside deviation. In 1946 RH Packwood, Auckland District Engineer wrote “The Morningside Deviation was first projected over 30 years ago” and “The existing passenger station was sited ….with the Morningside Deviation in view.” (BAEI 10003/269g)

Following the 1949 report, a Master Transport Plan for Metropolitan Auckland was developed by the Auckland Regional Planning Authority. The priority for railway construction under the plan was the Auckland Morningside deviation, which was to take a similar, but not identical, route to the 1928/29 plan. During 1952 and 1953 an investigation of buildings along the proposed route was undertaken, looking at condition, type of foundation and value.

In 1968 an Auckland Rapid Transit [ART] committee was formed to investigate railway solutions to Auckland’s transport problems. Detailed planning and investigations were undertaken. It was decided that the priority was for a city underground line to be constructed in two phases: Auckland mainline station to the Civic Centre, then under Karangahape Road to Newmarket (a similar route to the Auckland Morningside deviation).
As part of the investigations, photographs were taken of some of the buildings along this route. There would be a system of linked bus services, trains would run with a minimum off-peak frequency of ten minutes, and fares would be based on a zone structure, with ticket transfer between bus and rail. The ART was disbanded on 31 March 1976.

This is a selection of images taken from the records of these three schemes.

Date: 09/12/08
Owner: Auckland Archives
Size: 28 items
8 Oxford Street, 1953

8 Oxford Street, 1953

BABJ A680/4

Date: 09/22/08
Views: 260
Keywords: 8 Oxford Street, residence
Proposed Rapid Transit Network, c.1970

Proposed Rapid Transit Network, c.1970

BABJ A680/F8

Date: 09/12/08
Views: 833
Keywords: Proposed Rapid Transit Network, Auckland, ART
Section of proposed underground station, 1969

Section of proposed underground station, 1969

BABJ A680 F8

Date: 09/12/08
Views: 706
Keywords: conceptual design, ART, Auckland Rapid Transit, Section of proposed underground station
Downtown station, c.1974

Downtown station, c.1974

BABJ A680/F8

Date: 10/01/08
Views: 477
Keywords: Auckland downtown station
Auckland Rapid Transit train floor plan, 1974

Auckland Rapid Transit train floor plan, 1974

BABJ A680/F8

Date: 09/30/08
Views: 1308
Keywords: Auckland Rapid Transit train floor plan, 1974, Auckland Rapid Transit plans, ART
Station Hotel, c.1973

Station Hotel, c.1973

no 81. BABJ A680/70

Date: 09/22/08
Views: 318
Keywords: Station Hotel, Beach Road
Dilworth Building, c.1973

Dilworth Building, c.1973

no 76. BABJ A680/70

Date: 09/22/08
Views: 408
Keywords: Dilworth Building, corner of Queen Street and Customs Street East
Great Northern Hotel, Customs House and West Plaza Building, c.1973

Great Northern Hotel, Customs House and West Plaza Building, c.1973

no.75 BABJ A680/70

Date: 09/22/08
Views: 448
Keywords: Great Northern Hotel, Customs House, West Plaza Building, Customs Street West, c.1973
Custom House - Albert Street frontage, c.1973

Custom House - Albert Street frontage, c.1973

no.41 BABJ A680/70

Date: 09/22/08
Views: 402
Keywords: Custom House, Albert Street frontage, c.1973, kenny willis ortiz
T & G Building from Bledisloe Street, c.1973

T & G Building from Bledisloe Street, c.1973

no.70 BABJ A680/70

Date: 09/22/08
Views: 374
Keywords: T & G Building from Bledisloe Street
Auckland Town Hall during excavation for building of civic underground car park c.1973

Auckland Town Hall during excavation for building of civic underground car park c.1973

BABJ A680 70

Date: 09/22/08
Views: 611
Keywords: Auckland Town Hall during excavation for building of civic underground car park c.1973
Civic Theatre, c.1973

Civic Theatre, c.1973

no.14 BABJ A680/70

Date: 09/22/08
Views: 372
Keywords: Civic Theatre, Queen, Wellesley
 
Page: 1 2 3
 

Actions

Advanced Search
View Slideshow

Auckland Gallery

1. Auckland... 2. Auckland... 3. Auckland...
Powered by Gallery v2.2